Silgan Plastics


Silgan Plastics

Scope of Project:

  • Utility Room: Design, supply and install a forced air ventilation system that removes the unwanted heat in the utility room while maintaining the room at a positive pressure of .125”w.c.
  • Resin Room: Design, supply and install a forced air ventilation system that maintains the room at a negative pressure of .125”w.c.



Project Summary

Location: Ottawa, OH
Project Type: New Construction
Building Usage: Plastic molding production
Objectives: Maintain room pressures as specified
HVAC Controls: Johnson Controls Facility Explorer System
Installation Date: 2010
Controls Contractor: New Idea Controls

3855 S. Wapak Rd.

Lima, OH 45806

Phone: 419.879.7557

Fax: 419.999.6593



Site by: Midnet Media

Share by: