Silgan Plastics
Scope of Project:
- Utility Room: Design, supply and install a forced air ventilation system that removes the unwanted heat in the utility room while maintaining the room at a positive pressure of .125”w.c.
- Resin Room: Design, supply and install a forced air ventilation system that maintains the room at a negative pressure of .125”w.c.
Project Summary
Location: Ottawa, OH
Project Type: New Construction
Building Usage: Plastic molding production
Objectives: Maintain room pressures as specified
HVAC Controls: Johnson Controls Facility Explorer System
Installation Date: 2010
Controls Contractor: New Idea Controls